STANDARDS - RENT OFFICE SPACE - EMPTY SPACE (6.FL) | |
---|---|
GROUNDWORK | monolithic reinforced concrete slab |
VERTICAL FRAMEWORK | reinforced concrete frame, reinforced concrete shield walls circumferentially filled with brick masonry |
VODOROVNÉ NOSNÉ KONŠTRUKCIE | železobetónové stropné dosky, monolitické železobetónové schodisko |
PERIPHERAL SURFACE / WINDOWS | glass facade AI system, opening windows with insulating 3-glass in the sense PD, color: anthracite |
DIVIDING PARTITIONS |
MAIN PARTITIONS walls separating corridor from room: SDK 125 mm; surface painting (white) INNER PARTITIONS between tenants: SDK 125 mm |
CEILINGS | reinforced concrete slab |
SURFACE FLOORS |
corridors, common areas - ceramic tiles office: anhydride screed terraces: concrete pavement on targets |
INTERIOR ENTRY DOORS | glazed door in aluminum frame |
ELECTRICAL INSTALLATION / LIGHTING |
sub-meters floor troughs preparation for wiring (connection points in the sense of PD) |
LOW POWER INSTALATION |
preparation - low-power connection for individual premises /
internet - in the sense of PD Note: floor troughs (see electrical installation point) |
CAMERA SYSTEM | terminal equipment within public buildings, in the sense of PD |
ELECTRONIC FIRE SIGNALING AND VOICE SIGNALING OF FIRE |
complete solution within an object, in the sense of PD |
HEATING / COOLING |
large radiant floor heating / cooling heat and hot water source: TEKO heat exchanger / heat source source of cold: groundwater for so-called freecooling in combination with chiller water - water note: ceiling cooling / cassette air conditioning (fancoil) under the standard |
AIR CONDITIONING | preparation for VZT - inlet and outlet pipes (connection points in the sense of PD) |
MEDICAL | preparation of ZTI - for the supply of media, water distribution and sewerage (connection points in the sense of PD) |
AUTOMATIC CONTROL (M and R) |
measurement of CO2, humidity, cooling and heating within
individual zones (in the space above 300 m2 within the
standard) control of ventilation |
ELEVATOR |
3 personal elevators (between 3.GF and 6.FL) 1 personal elevators (between 3.GF and 1.FL) 1 cargo elevator (between 3.GF and 6.FL) |
LIGHTING CONDUCTOR | solved within an object |
GARAGE STATION - internal | |
MARKING | by the number of the parking space |
ENTRANCE | through an opening ramp, via a chip |
THE FLOOR | "armored", abrasion resistant, waterproof, washable, concrete floorboard |
Note:
We offer the completion of the spaces
to the required standard.
It's possible to calculate the
price of budget for the completion of spaces (depends on the
equipment) to rent price in agreement.